City of Pasadena Soft-Story Retrofit Program

Pasadena Compliance Deadlines

Time Period Timeline

Under Ordinance 7345, deadlines are based on the date of the City’s Notice to Owner.

1 Year From Notice

Screening Form (optional, for exemption only)

3.5 years

Obtain building permit

7 Years

Complete construction

COVID Extension

The 3-year deadline for plan submittal/permit was extended to 4 years. Other deadlines remain unchanged.

Professional Engineering, Screening Reports, Retrofit Plans & Permit Support

The City of Pasadena adopted Ordinance No. 7345 to strengthen existing multi-family wood-frame buildings with Soft, Weak, or Open-Front Wall Lines (SWOF). These structures historically performed poorly during past earthquakes such as the 1989 La Prieta and 1994 Northridge events.

Pasadena identified approximately 493 wood soft-story buildings requiring evaluation or retrofit.

Is Your Building Required to Comply?

A building is subject to the ordinance if:
Exceptions:

Priority Groups and Notices

Pasadena assigns each property to a priority group:
Parcels containing buildings with 3+ stories, or 25+ dwelling units, or designated historic buildings
Parcels containing 10 to 24 units total
All non-historic, 2-story buildings with 5 to 9 units total
Priority 1 – December 5, 2019

Learn About the Program

Pasadena’s ordinance strengthens older multi-family buildings to ensure they meet minimum seismic safety levels. The ordinance applies to buildings with ground-floor parking or openings that create SWOF conditions. Buildings with prior retrofits must still demonstrate compliance based on current standards.

The Screening Form is optional and used only if the owner believes the building is exempt from the ordinance.

Requirements:

  • Must be completed by a licensed civil or structural engineer
  • Must show the structure conforms to seismic design provisions of Chapter 14.08
  • If the screening form is accepted, retrofit is not required
  • If not submitted within the deadline, retrofit is automatically required 

Owners must hire a licensed engineer to:

  • Perform a full structural analysis
  • Determine existing SWOF deficiencies
  • Design a code-compliant retrofit per Pasadena Seismic Design Guidelines
  • Provide calculations, construction details, load path continuity, diaphragm analysis, and drift checks
  • Address hillside conditions, pole structure requirements, and irregularities
A building may qualify for exemption if:
All exemption claims must be supported by the Screening Form.
Pasadena enforces the ordinance by priority group:
Retrofit sequencing aligns with these priority designations.

Screening and Evaluation

Retrofit Design

Permit Coordination

Construction Support

Frequently Asked Questions

Do all buildings need to comply?
No. Only pre-1978 multi-family wood-frame buildings with SWOF conditions.
Who can complete the Screening Form?
A California-licensed Civil Engineer, Structural Engineer, or Architect.
Can my building be exempt?

Yes. The Screening Form evaluation determines exemption eligibility.

What if a previous retrofit was completed?
If prior work meets current ordinance standards, the building may be exempt but documentation must be reviewed by the City.
What happens if deadlines are missed?
The City may issue violations and require immediate compliance.
Do tenants need to be notified?
Yes. Required postings and construction notices must be provided.
Does Beverly Hills offer fee refunds?
Refund incentives exist only if construction was completed early but since original deadlines have passed, this no longer applies for new projects

Get Started

SoCal Structural handles Beverly Hills soft-story retrofits end-to-end, screening, engineering, permitting, and construction support. Reach out for a free estimate and we’ll walk you through exactly where your building stands.